Crow Canyon Road

Project Overview

The Alameda County Public Works Agency has several projects along Crow Canyon Road, between East Castro Valley Boulevard and the County line.  These projects are being implemented in four phases and include roadway resurfacing, pavement reconstruction, storm damage repair, and various safety improvements.

Project Features

Phase I - Resurfacing and Safety Improvements

  • Resurface pavement between East Castro Valley Blvd and Cold Water Drive
  • Construct roadway shoulder improvements to accommodate traffic law enforcement
  • Install pedestrian ramps, speed feedback signs, and new guardrails
  • Replace damaged culverts under roadway
  • Install traffic signal improvements
Phase II - Storm Damage Repair

  • Install retaining walls between MM 6.00 and MM 6.25
Phase III - Pavement Reconstruction

  • Perform roadway pavement reconstruction from MM 5.25 to the County line
  • Replace/Install guardrails
  • Install centerline rumble strips
  • Culvert replacement
  • Signing and striping

Phase IV – Guardrail Replacement

  • Replace existing guardrails from San Simeon place to Norris Canyon Road

Community Outreach

CIP Category    

Pavement Rehabilitation and Transportation Infrastructure Safety

Construction Start Date

Phase I Resurfacing and Safety Improvements - December 2021

Phase II Storm Damage Repair - September 2022

Phase III Pavement Reconstruction - Summer 2024

Phase IV Guardrail Replacement – Summer 2024

Status

  • Phase II Storm Damage Repair - COMPLETED
  • Phase III Pavement Reconstruction – Construction
    • Please be advised that Crow Canyon Road will be closed to through traffic between Crow Canyon Mile Marker 5.25 and County Line (Bollinger Canyon Road) starting April 11 Through August.
    • The road is being closed to facilitate construction of the third phase of roadway and culvert reconstruction.
  • Phase IV – Constructions

Project Location

Crow Canyon Road, from East Castro Valley Blvd. to the Contra Costa/Alameda County Line

District

District 4

Project Manager

Bond Ng,  Associate Civil Engineer
James Lai, Supervising Contruction Inspector

Contact

For more information email info@acpwa.org or call the construction hotline at (510) 670-5591Click here to receive e-mail updates.