Improvements of Ardenwood Creek from 0.4 Mile Downstream of Paseo Padre Parkway and Patterson Ranch Road in Fremont

Zone 5 Project

Project Overview

Recent channel condition assessments identified that sediment buildup had caused negative drainage effects along an already flat portion of the Ardenwood Creek channel.

The purpose of the improvements are to restore channel dimensions and promote positive drainage to the Bay, reducing backwater effects upstream.

Project Features

  • Excavation and removal of excess sediment within the channel bottom and banks
  • Regrading of side slopes to original channel dimensions

Community Meeting

All work to be complete within District right of way.

CIP Category

Major Maintenance Project

Construction Start Date

Construction is anticipated to begin in July 2025.  Mechanized construction work within the banks of the channel will be completed between September 1 and October 15, 2025.  Planting and seeding work may continue until November 30, 2025.

Status

The project has been advertised for construction bids.  Should an acceptable bid be received, a construction contract is anticipated to be awarded in June 2025.  Construction is anticipated to begin in July 2025.  

Project Location

Ardenwood Creek from 0.4 mile downstream of Paseo Padre Parkway to Patterson Ranch Road



Supervisorial District

District 2

Project Manager

Simon Montrose, Project Engineer

Contact

For general questions about the project:
Project Engineer: Simon Montrose; (510) 670-5458;
email: simonm@acpwa.org

For construction matters:

Alameda County Public Work Agency’s Construction Department
Office Phone No.: (510) 670-5450; E-mail: info@acpwa.org