Project Overview
Recent pump station condition assessments indicated Eden Landing and Besco pump stations have various structural deficiencies at the existing outfall structures and flap gates.
The purpose of the improvements are to rehabilitate the existing outfall concrete structures and flap gates in order to extend the service life of the pump station outfall structures. To correct structural deficiencies, the headwall and wingwall with spalled concrete will be removed and replaced with new concrete, and the existing flap gates will be replaced with new flap gates and equipped with cathodic protection systems.
Project Features
- Rehabilitate existing concrete outfall structures
- Replace existing flap gates
- Installation of cathodic protection systems
Community Outreach
All work to be completed within District right-of-way
CIP Category
Pump Station Rehabilitation
Construction Start Date
Summer 2025
Status
This project has been awarded for construction. The construction of this project is anticipated to begin in summer 2025.
Project Location
Besco Pump Station:
The Besco Pump Station Outfall Structure Rehabilitation project is located upstream of Ward Creek at Hesperian Boulevard, near the Pepsi Beverages Company, in the City of Hayward.
Eden Landing Pump Station:
The Eden Landing Pump Station Outfall Structure Rehabilitation project is located at the terminus of Eden Landing Road, where it intersects with Mt. Eden Creek, within the City of Hayward.
Supervisorial District
District 2
Project Manager
Paul Knobel, P.E.
Contact
For more information email info@acpwa.org or call the construction hotline at (510) 670-5591. Click here to receive e-mail updates.