BESCO AND EDEN LANDING PUMP STATION OUTFALL STRUCTURES REHABILITATION IN HAYWARD

ZONE NO. 3A PROJECT

Project Overview

Recent pump station condition assessments indicated Eden Landing and Besco pump stations have various structural deficiencies at the existing outfall structures and flap gates.

The purpose of the improvements are to rehabilitate the existing outfall concrete structures and flap gates in order to extend the service life of the pump station outfall structures. To correct structural deficiencies, the headwall and wingwall with spalled concrete will be removed and replaced with new concrete, and the existing flap gates will be replaced with new flap gates and equipped with cathodic protection systems.

Project Features

  • Rehabilitate existing concrete outfall structures
  • Replace existing flap gates
  • Installation of cathodic protection systems

Community Outreach

All work to be completed within District right-of-way

 

CIP Category

Pump Station Rehabilitation

Construction Start Date

Summer 2025

Status

This project has been awarded for construction. The construction of this project is anticipated to begin in summer 2025.

Project Location

Besco Pump Station:

The Besco Pump Station Outfall Structure Rehabilitation project is located upstream of Ward Creek at Hesperian Boulevard, near the Pepsi Beverages Company, in the City of Hayward.

Eden Landing Pump Station:

The Eden Landing Pump Station Outfall Structure Rehabilitation project is located at the terminus of Eden Landing Road, where it intersects with Mt. Eden Creek, within the City of Hayward.


Supervisorial District

District 2

Project Manager

Paul Knobel, P.E.

Contact