Norbridge Avenue Improvement Project

Project Overview

The Norbridge Avenue Improvement Project, from 230’ south of Stanton Avenue to Tyee Court, is located in Castro Valley.  Project features include constructing new concrete curb, gutter, sidewalk, Class II bike lanes, driveways, pedestrian ramps, and rehabilitating the pavement.  The goal is to establish a continuous ADA-compliant path of travel along this roadway the roadway. Traffic control measures and best management practices (BMPs) will be implemented to protect the environment, and utility relocations will also be included.

Project Features

  • New Concrete Sidewalks
  • New Concrete Curbs and Gutters
  • New Driveways
  • Class II Bicycle Lanes
  • Pavement Rehabilitation

         

CIP Category

Sidewalk and Bicycle Improvements and Pavement Rehabilitation Programs

Construction Start Date

Summer 2026

Status

Final Design

Project Location

Norbridge Avenue from 230’ south of Stanton Avenue to Tyee Court in Castro Valley.

Supervisorial District

District 4 

Project Team

Emanual Kasegne, Project Engineer

Bond Ng, Project Engineer

James Lai, Construction Inspector

Contact

For more information email info@acpwa.org or call the construction hotline at (510) 670-5591.