East Bay Greenway Multimodal Project

From Bayfair Drive to 162nd Avenue Along East 14th Street

Project Overview

The East Bay Greenway Multimodal Project extends along East 14th Street between Bayfair Drive and 162nd  Avenue, with a connection from East 14th Street to the Bay Fair BART station that follows 159th Avenue and Coelho Drive to Thornally Drive at the San Leandro City Limit.

The project is part of a larger initiative to connect the East Bay via the East Bay Greenway, a regional trail of bicycle and pedestrian facilities covering approximately 16 miles through Oakland, San Leandro, Hayward, Ashland and Cherryland. Sections of the East Bay Greenway are in various stages of delivery, with some segments under design or construction and others already completed, including segments of E. 14th St and Mission Blvd in unincorporated areas of Alameda County.

Planned improvements will enhance safety, accessibility, and connectivity for pedestrians, bicyclists and motorists along the corridor.

Project Features

Streetscape Improvements

  • New concrete sidewalks and enhanced crosswalks
  • ADA accessibility improvements
  • New protected bike lanes
  • Intersection bulb-outs
  • Pavement resurfacing
  • Pedestrian-scale lighting
  • New Landscaped Medians
  • Stormwater quality improvements
  • Bus boarding islands
  • Bike racks
  • Decorative Street Furnishings
  • Public art installations

      Community Outreach

      The East Bay Greenway project design team will be holding a community meeting on Tuesday, November 17, 2026

      Community members are invited to stop by anytime during the event to learn more about the project, provide feedback on the proposed improvements, and speak directly with the project design team.

      Time: 6 PM – 8 PM (Presentation at 6:30 PM)

      Location: REACH Ashland Youth Center

      16335 E 14th St
      San Leandro, CA 94578

      CIP Category

      Major Infrastructure Improvement Program

      Construction Start Date

      Spring 2028 (Pending Construction Funding)

      Status

      Design

      Project Location

      East 14th Street between Bayfair Drive and 162nd Avenue

      East Bay Greenway

      Supervisorial District

      District 4

      Project Manager

      Justin Quach, P.E., Associate Civil Engineer

      Contact

      For more information email info@acpwa.org or call 510-670-5480.

      Alameda County Transportation Commission