Line A-1 Underground Bypass Zone No. 12

LINE A-1 CLAREMONT AVENUE UNDERGROUND BYPASS BETWEEN TANGLEWOOD ROAD IN OAKLAND, ALAMEDA COUNTY, CALIFORNIA

Project Overview

The Alameda County Flood Control and Water Conservation District (District) owns and maintains an underground storm drain system (Line A-1) along Claremont Avenue upstream of Tanglewood Road in the City of Oakland.  A recent drainage study determined that the existing Line A-1 near Claremont Avenue, lack sufficient capacity to convey the 100-year design storm event (a storm with a 1 percent annual chance of occurrence).

To address this conveyance deficiency and reduce the potential for future flooding in the area, the District proposes to construct a new underground storm drain bypass along Claremont Avenue.  The proposed bypass would begin at Tanglewood Road and reconnect to the existing Line A-1 system downstream at Mystic Street, in Oakland.  The project consists of approximately 4,080 linear feet of 60-inch-diameter underground storm drain along with manholes and junction structures.

Construction of the proposed improvements is planned to occur in multiple phases over an approximately five-year period.

Project Features

  • Underground 60” diameter culvert bypass system and associated transition junction structures

Community Outreach

  • Residences and business in close proximity to the Project site will be notified via mailed letter, once a construction contract is confirmed for award. For project information and updates, visit Alameda County Public Works Agency’s website: Line A-1 Claremont Ave Underground Bypass-Zone No. 12 | ACPWA
  • The Project was presented to the Claremont Elmwood Neighborhood Association, in the City of Berkeley, on June 15, 2026.

CIP Category

Capacity Improvement

Construction Start Date

Mobilization (Year-1): Spring 2027.
See Phasing Map below for work in subsequent years

Status

The Project has been advertised and Bids submitted. Construction Contract is anticipated to be awarded by end-2026

Project Location

Along Claremont Avenue between Tanglewood Road and Mystic Street in City of Oakland and City of Berkeley.

Claremont-UndergroundBP-Map

Supervisorial District

District 5

Project Manager

Paul Knobel, P.E.